# Commercial Boiler Service Toronto | RTU Toronto Pros

> Commercial boiler service Toronto: repair, retrofit $15K-$80K, hydronic pumps and loops. TSSA G1/G2 gas techs. 24-hour written quote. Rebates filed.

URL: https://rooftopunitstoronto.ca/commercial-boiler-hydronic-toronto/

![Condensing commercial boilers with hydronic piping in a Toronto boiler room](/images/misc/pair-of-condensing-commercial-boilers-with-stainle.webp)

TSSA G1 + G2 Gas Techs

# Commercial Boiler and Hydronic Service, Repair and Retrofit in Toronto

Last updated: October 24, 2026

Boiler repair and retrofit with TSSA G1/G2 gas techs, plus hydronic pumps, loops and controls.

-   Boiler lockouts
-   Short cycling
-   Cold zones
-   Leaking hydronic loop
-   Red-tagged appliance
-   High gas bills

Book a Site Assessment

[/contact/ →](/contact/)

 

View Pricing

[#pricing →](#pricing)

24-Hour Written Quote

From $15,000 per boiler retrofit

-   Parts, labour, crane, permit + HST on one line
-   2-4 hr on-roof emergency response, GTA core
-   Save on Energy rebate filed on qualifying work

Red Seal HVAC-RTSSA G1 + G2ESA + CRE$5M + WSIB

24/7 Dispatch (437) TBD

[tel:+14370000000 →](tel:+14370000000)

-   24-Hour Written Quote (not a sales pitch)
-   24/7 Emergency RTU Dispatch (2-4 hr on-roof GTA core)
-   Red Seal HVAC-R + TSSA + ESA + CRE Chiller
-   $5M Liability + WSIB + COI in 24 Hours
-   Save on Energy Rebate Filed on Your Behalf

1,800+

GTA installs

97%

Uptime

2-4 hr

On-roof, GTA core

48

Sites under contract

Symptoms first

## Is Your Equipment Showing These Signs?

Lockouts on cold mornings, short cycling, cold zones, leaking loops or a red-tagged appliance: our TSSA G1/G2 gas techs repair and retrofit commercial boilers and hydronic systems. Retrofits run $15K-$80K, our highest-ticket specialty after chillers.

-   Boiler lockouts
-   Short cycling
-   Cold zones
-   Leaking hydronic loop
-   Red-tagged appliance
-   High gas bills

Seeing one of these? 

Book a site assessment

[/contact/ →](/contact/)

 or call dispatch for a 2-4 hour on-roof visit in the GTA core.

## Common Commercial Boiler Problems in Toronto

Commercial boiler service calls cluster on the coldest mornings of the year. The boiler locks out at 5am. It short cycles on and off. Upper floors or far zones stay cold while the lobby overheats. A hydronic loop starts leaking. Or an inspector hangs an **Enbridge red tag** on the gas valve and the building has no heat.

Most of these problems are a mix of boiler and system. A boiler can be perfectly healthy while a failed **circulation pump** or air-bound **hydronic loop** leaves half the building cold. That is why we look at the whole heating plant, not only the boiler.

## Boiler Repair and Safety

Our TSSA G1 and G2 gas techs start with safety: combustion analysis, **venting** inspection, gas pressure, flame safeguard and low water cut-off testing. Common repairs include burners, igniters, flame sensors, gas valves, pressure switches and controls. All gas work follows **CSA B149.1**.

When an appliance is red-tagged, we repair or replace it to code and arrange re-inspection so the tag can be cleared. In winter, single-boiler buildings get a temporary boiler while the permanent fix is done.

## Condensing or Non-Condensing Boiler?

A **condensing boiler** can reach very high efficiency, but only when **return water temperature** is low enough for flue gas to condense. Buildings with low-temperature heating, radiant floors or proper outdoor reset get the full benefit. Older systems designed for high water temperatures may suit a **non-condensing boiler**, or a hybrid plant that uses condensing boilers in shoulder seasons.

|  | Condensing | Non-condensing |
| --- | --- | --- |
| Efficiency | Highest at low return temps | Lower, steady |
| Venting | Stainless or plastic, condensate drain | Traditional venting |
| Best for | Low-temp loops, outdoor reset | High-temp legacy systems |
| Incentives | Often eligible | Less often |

## Hydronic Pumps, Loops and Controls

We replace and upgrade circulation pumps (often with VFDs), zone valves, expansion tanks and heat exchangers, purge air from loops, and rebalance flow. Boiler staging and outdoor reset controls are tuned so the plant matches the load. For pump VFDs, see 

VFD upgrades

[/vfd-upgrade-commercial-hvac-toronto/ →](/vfd-upgrade-commercial-hvac-toronto/)

.

## How Much Does a Commercial Boiler Retrofit Cost?

Boiler retrofits run **$15K-$80K**, our highest-ticket specialty after chillers. Scope drives the number: boiler count and size, venting changes, gas train upgrades, pumps and controls. Full plant room retrofits including pumps, chillers and BAS run $75K-$300K; see 

high-rise mechanical room HVAC

[/high-rise-mechanical-room-hvac-toronto/ →](/high-rise-mechanical-room-hvac-toronto/)

.

**Enbridge incentives** often offset part of a high-efficiency retrofit, and pump and fan VFDs can qualify for 

Save on Energy

[/save-on-energy-retrofit-toronto/ →](/save-on-energy-retrofit-toronto/)

. We file both.

## Where We Work

We service boilers and hydronic systems in office buildings, condo towers, schools and plazas across 

North York

[/service-areas/north-york/ →](/service-areas/north-york/)

, Downtown Toronto, Etobicoke, Scarborough and the wider GTA, often on the same properties where we look after the 

commercial rooftop units and chillers

[/ →](/)

.

Published pricing

## How Much Does Boilers + Hydronics Cost in Toronto?

Ranges from recent GTA jobs. Your written quote lands within 24 hours with parts, labour, crane, permit and HST on one line, and rebate-net pricing where the work qualifies.

25/50/25 payment on installs: 25% at order, 50% on install day, 25% on commissioning sign-off. Net-30 for commercial and PM accounts. 

See all pricing

[/pricing/ →](/pricing/)

.

### Boilers + Hydronics pricing

CAD + HST

| Service | Price | Timeline |
| --- | --- | --- |
| Boiler retrofit | $15K-$80K | 1-3 wks |
| Mechanical room retrofit | $75K-$300K | 4-8 wks |
| Pump VFD upgrade per unit | $8K-$40K | 2-5 days |

Why property teams pick us

## Why Choose Rooftop Units Toronto Pros for Boilers + Hydronics?

### TSSA G1 + G2 techs

Licensed for commercial gas appliances of every size, including the gas trains on large boilers.

### Red tags cleared properly

Enbridge red-tagged appliances are repaired or replaced to code, then inspected, not patched.

### Condensing done right

Condensing boilers only save gas with low return water temperature. We design the loop and controls to get it.

### Incentives filed

Enbridge incentives and Save on Energy support for pumps and VFDs filed for you.

What to expect

## How Does Our Boilers + Hydronics Work?

1.  01
    
    ### Safety + diagnosis
    
    Combustion analysis, venting, safeties and controls checked. Unsafe appliances are made safe first.
    
2.  02
    
    ### Written options
    
    Repair, condensing retrofit or non-condensing replacement priced side by side with Enbridge incentives shown.
    
3.  03
    
    ### Install
    
    Boilers, venting, gas train, pumps and controls installed to CSA B149.1 by TSSA-licensed techs.
    
4.  04
    
    ### Commission
    
    Combustion tuning, staging and outdoor reset setup, and a commissioning report.
    

Field photos

## Our Boilers + Hydronics Work

Recent GTA rooftops and mechanical rooms. Click any photo to enlarge.

### Before + After

![Old red-tagged atmospheric boiler](/images/cards/old-atmospheric-commercial-boiler-with-rusted-jack.webp)

Before

![Replacement condensing boiler with new venting](/images/cards/replacement-condensing-boiler-with-new-venting-and.webp)

After

Boiler retrofits run $15K-$80K, with Enbridge incentives filed where they apply.

Client Records

## What Clients Say About Our Boilers + Hydronics

> "Our reserve fund study flagged the pumps and boiler. They turned it into a phased plan the board could approve in one meeting."

ASArjun S.Property manager, Willowdale

> "Our old boiler was red-tagged on a Friday in January. They had a temporary boiler on site that night and the replacement in within two weeks."

PNPatricia N.Facility manager, Etobicoke

> "The Forest Hill school penthouse retrofit ran over the summer break and the plant was back online before staff returned. Clear weekly reports to our facilities office."

GWGrace W.Facilities lead, Forest Hill

> "The new condensing boilers cut our gas bill noticeably the first winter, because they also fixed the return water temperature on the loop."

LMLeo M.Owner, Scarborough office building

> "Cold suites on the upper floors turned out to be a failing pump and air in the loop. Fixed in one visit."

STSandra T.Condo manager, Yonge-Eglinton

## RTU offline or chiller alarm?

Red Seal tech on the roof in 2-4 hrs across the GTA core. Call (437) TBD.

(437) TBD

[tel:+14370000000 →](tel:+14370000000)

 

Emergency Service

[/emergency-rooftop-unit-repair-toronto/ →](/emergency-rooftop-unit-repair-toronto/)

Buyer questions

## Boilers + Hydronics FAQs

Still have a question?

A Red Seal lead answers, not a call centre. Written quote within 24 hours.

Book a Site Assessment

[/contact/ →](/contact/)

(437) TBD

[tel:+14370000000 →](tel:+14370000000)

### How much does a commercial boiler retrofit cost in Toronto?

Boiler retrofits run $15K-$80K depending on size, number of boilers, venting changes, pumps and controls. Larger plant room retrofits that include chillers and pumps run $75K-$300K. Enbridge incentives can offset part of a high-efficiency retrofit.

### Should I choose a condensing or non-condensing boiler?

Condensing boilers reach their efficiency only when return water is cool enough to condense flue gas, usually below about 55C. Buildings with low-temperature heating or good outdoor reset control benefit most. Older high-temperature systems may suit non-condensing boilers or a hybrid plant.

### What does an Enbridge red tag mean?

A red tag means the gas appliance was found unsafe and its gas supply was shut off or must stay off until repaired and inspected. Our TSSA G1 and G2 techs repair or replace the appliance to code so the tag can be cleared.

### Why does my boiler keep locking out on cold mornings?

Common causes are a dirty flame sensor, failing igniter, venting or combustion air problems, low water cut-off trips or gas pressure issues. Combustion analysis and a safety check find the cause.

### Why are some zones cold while others are fine?

Usually a failing circulation pump, air in the hydronic loop, a stuck zone valve or a balancing problem. Fixing the loop often matters more than the boiler itself.

### Can you keep the building heated during a boiler replacement?

Yes. Multi-boiler plants are replaced one boiler at a time. Single-boiler buildings get a temporary boiler during winter changeovers.

### Do you service hydronic pumps and controls too?

Yes. Pumps, VFDs, zone valves, expansion tanks, heat exchangers and boiler staging and outdoor reset controls are all part of hydronic service.

### Are boiler retrofits eligible for incentives?

High-efficiency boilers can qualify for Enbridge incentives, and pump VFDs can qualify for Save on Energy. We confirm eligibility and file the paperwork.

### Do you work to CSA B149.1?

Yes. All gas work is done by TSSA-licensed techs to the CSA B149.1 Natural Gas and Propane Installation Code.

### Do you offer boiler maintenance?

Yes. Annual combustion analysis, burner cleaning, safety testing and water treatment checks can be bundled with RTU and chiller maintenance in one contract.

Keep the whole roof covered

## Related Services

 

![Penthouse mechanical room with new pumps and piping in a Toronto condo tower](/images/misc/high-rise-penthouse-mechanical-room-with-new-circu.webp) From $75,000

[/high-rise-mechanical-room-hvac-toronto/ →](/high-rise-mechanical-room-hvac-toronto/)

### 

High-Rise Mechanical Room HVAC

[/high-rise-mechanical-room-hvac-toronto/ →](/high-rise-mechanical-room-hvac-toronto/)

Penthouse and basement plant retrofits: pumps, hydronic loops, chillers, controls, with board communication handled.

Details + pricing

[/high-rise-mechanical-room-hvac-toronto/ →](/high-rise-mechanical-room-hvac-toronto/)

 

![Variable frequency drive panels beside supply fans in a Toronto mechanical room](/images/misc/variable-frequency-drive-panels-mounted-beside-lar.webp) From $8,000

[/vfd-upgrade-commercial-hvac-toronto/ →](/vfd-upgrade-commercial-hvac-toronto/)

### 

VFD Upgrades for Commercial HVAC

[/vfd-upgrade-commercial-hvac-toronto/ →](/vfd-upgrade-commercial-hvac-toronto/)

Variable frequency drive retrofits on supply fans, pumps, towers and chillers.

Details + pricing

[/vfd-upgrade-commercial-hvac-toronto/ →](/vfd-upgrade-commercial-hvac-toronto/)

![New high-efficiency rooftop units on a Mississauga roof with a rebate application](/images/misc/new-high-efficiency-packaged-rooftop-units-on-a-mi.webp)

[/save-on-energy-retrofit-toronto/ →](/save-on-energy-retrofit-toronto/)

### 

Save on Energy Retrofit

[/save-on-energy-retrofit-toronto/ →](/save-on-energy-retrofit-toronto/)

Pre-audit, application and rebate netted against your invoice on qualifying HVAC retrofits.

Details + pricing

[/save-on-energy-retrofit-toronto/ →](/save-on-energy-retrofit-toronto/)

## Don't See Your GTA City?

Coverage from Toronto to Pearson, Mississauga to Markham. Call 

(437) TBD

[tel:+14370000000 →](tel:+14370000000)

 for a 24-hour written quote.

All Service Areas

[/service-areas/ →](/service-areas/)

 

Get a Written Quote

[/contact/ →](/contact/)

![Packaged rooftop units on a Toronto commercial roof at dusk](/images/misc/toronto-commercial-rooftop-at-dusk-with-a-row-of-p.webp)

24/7 dispatch | 2-4 hr on-roof GTA core

## Ready to Book Boilers + Hydronics?

Site assessment, then a written quote within 24 hours. Parts, labour, crane, permit and HST on one line.

Book a Site Assessment

[/contact/ →](/contact/)

 

Call (437) TBD

[tel:+14370000000 →](tel:+14370000000)

-   24-hour written quote
-   Save on Energy filed for you
-   Red Seal + TSSA + ESA + CRE
-   $5M liability + WSIB
